Modification P00002 funds Option Year 1 of contract HHM402-08-C-0072 at $11,948,810, raising total obligation to $21,948,810.

Disclosure Rating — 4/10

DOW-UAP-D113 is modification P00002 to AAWSAP contract HHM402-08-C-0072, effective February 2, 2010.1 The Department of War released it in PURSUE Release 06 on September 18, 2026, alongside the rest of the contract sequence (DOW-UAP-D110 through DOW-UAP-D116).23 Issued by the Defense Intelligence Agency's Virginia Contracting Activity at Bolling Air Force Base, Building 6000, Washington, D.C., to Bigelow Aerospace Advanced Space Studies, LLC, of Las Vegas, Nevada, it funded the first option year of the September 22, 2008 contract (DOW-UAP-D111) at $11,948,810.00, less than half the $25,000,000.00 scheduled in P00001.1

  Purpose of the Modification

Modification P00002 obligates $11,948,810.00 to fund Option Year 1 of HHM402-08-C-0072—a reduction of more than 52 percent from the $25,000,000.00 schedule in modification P00001 (DOW-UAP-D112)—and removes the availability-of-funds clause cited in that September 2, 2009 action. It incorporates revised plans for using the 2010 funds and identifies how the reduced funding would affect deliverables and technical risk. Adding $11,948,810.00 to the $10,000,000.00 base year raises total obligated funding to $21,948,810.00, with all other terms unchanged, under FAR 52.212-4(c), Changes (March 2009).1

  Option Year Line Items

The schedule dates Option Year 1 from September 22, 2009, through September 21, 2010. Those are the original option dates, not the October 1, 2009, to September 30, 2010 term set in P00001 (DOW-UAP-D112). The funding is charged to accounting classification reference number (ACRN) AB. Revised line items fund Monthly Status Reports at $1,549,100.00 (quantity 12), a Project Management Plan for Tasks 3.a.1 through 3.a.12 (DOW-UAP-D110) at $4,759,300.00, a Research Report for those tasks at $2,870,600.00, a Comprehensive Integrated Threat Assessment at $220,200.00, Travel at $36,700.00, and Other Direct Costs at $2,494,610.00. New line items add Additional Travel at $18,300.00 and two unused zero-dollar lines retained to keep accounting aligned with revised CLINs.1

The modification documents the reduced $11,948,810.00 Option Year 1 obligation that brought cumulative funding on HHM402-08-C-0072 to $21,948,810.00. That funding covered the Option Year 1 period, in which most of the companion Defense Intelligence Reference Documents (DOW-UAP-D117 through DOW-UAP-D153) are dated. Two carry January 2011 dates, after the contract's December 21, 2010 end. The attachment describing how the cut affected deliverables was not released.1