DOW-UAP-D110 is the Statement of Objectives for the Advanced Aerospace Weapon System Applications Program (AAWSAP), dated July 18, 2008.1 The Department of War released it in PURSUE Release 06 on September 18, 2026, alongside the contract award and modification chain (DOW-UAP-D111 through DOW-UAP-D116) and 37 Defense Intelligence Reference Documents (DOW-UAP-D117 through DOW-UAP-D153).23 It asked a contractor to study the physics and engineering of breakthrough technologies that future aerospace weapon systems might use through 2050, as a basis for assessing foreign threats. The work covered 12 technical areas, including lift, propulsion, signature reduction, and human effects. The responsible office was the Defense Intelligence Agency (DIA) Acquisition Support Division (DWO-3), which handled Department of Defense acquisition guidance and future-threat projections.1
Objective and Study Areas
The statement explains that as complete an understanding as possible of potential breakthrough technology applications in future aerospace weapon systems is required to assess foreign threats to U.S. weapon systems. Its stated objective is to examine the physics and engineering of those applications through the year 2050, focusing on breakthrough technologies that create discontinuities in evolving trends rather than incremental extrapolations of current aerospace technology.1
The contract, later awarded to Bigelow Aerospace Advanced Space Studies, LLC as HHM402-08-C-0072 (DOW-UAP-D111), called for studies in 12 technical areas (Tasks 3.a.1 through 3.a.12): lift; propulsion; control; power generation; spatial/temporal translation; materials; configuration and structure; signature reduction (optical, infrared, radiofrequency, and acoustic); human interface; human effects; armament (RF and directed-energy weapons); and other supporting peripheral areas.1
Staffing, Security, and Deliverables
DIA required experts with at least 10 years of experience in breakthrough aerospace research and development, a lead integrator, and at least one PhD on each analytical team, with work performed at the contractor's facility. The work could involve material classified up to Top Secret with Sensitive Compartmented Information (SCI) access, and at least two contractor staff had to hold Secret clearances when the contract began. The anticipated term was five years—a 12-month base period plus four 12-month option years—structured as a firm-fixed-price contract.1
Required deliverables included monthly status reports; a 60-day project management plan for each technical area; a comprehensive research report and briefing for each area by the end of the tenth month; an integrated assessment of the foreign threat from advanced aerospace platforms at the end of the period of performance; and resumes of key personnel.1
The document establishes DIA's formal technical scope, staffing thresholds, security clearances, and deliverable schedule for AAWSAP prior to contract award in DOW-UAP-D111 and the resulting Defense Intelligence Reference Documents (DOW-UAP-D117 through DOW-UAP-D153). It does not contain technical findings or determine that any listed application existed in a foreign military inventory.1